Renovation and Demolition Abatement in Redondo Beach

Typical cost in Redondo Beach

  • Kitchen or bathroom remodel, one or two materials$2,000 – $5,500+
  • Whole-house remodel or teardown, several materials$15,000 – $40,000+

Before a remodel crew or a demolition crew starts, we remove the materials that tested positive. That can include ceilings, floors, walls and ducts, and the district notice goes in online.

In Rule 1403, demolition means wrecking or taking out any load-supporting structural member. The district wants notice of the intent to conduct any demolition, and positive material is gone before the next trade shows up.

Request a free quote
Empty room with clear plastic sheeting over the walls and windows, a bare wood floor and a light blue-gray portable air machine with a flexible hose.

What we handle before the work

Kitchens and baths

A single bath or kitchen job may open up floor tile, wall board and ceiling texture at once. Every one of them gets sampled, and the ones that test positive come out first, before the remodelers begin.

Whole-house remodels

A larger remodel opens more of the house, so the survey follows the plan room by room. The materials that tested positive are removed before the next trade arrives.

Teardowns

A teardown is demolition, so the district must be notified. Under state law, as the district describes it, the demolition permit application includes a copy of that notification.

Structural changes

Taking out a load-supporting wall is demolition under Rule 1403. Widening an opening in a wall that does not carry the structure is not demolition by that definition.

The district notice and fee

The web application is the route for each notice, and a notification is not considered received unless the required fee accompanies it.

The notice is due no later than 10 working days before any demolition or renovation activities begin, so leave at least 10 working days between filing and your start date.

Notification and training do not apply to a renovation that removes or strips asbestos-containing material over a surface of less than 100 square feet, whatever the building type. Demolition never qualifies, work practice and waste rules apply regardless, and testing is how the amount becomes known.

Waste and the air test

California’s hazardous-waste rules cover friable asbestos waste, which moves under a manifest with a licensed hauler. Because contractors cannot perform clearance air monitoring, any air test after removal is run by an independent consultant.

Room hung with loose clear plastic sheeting, an orange portable air machine at the back, sunlit windows and a dusty wood floor.

Before a crew is hired for a remodel or a teardown, the survey should be in hand, and asbestos testing and surveys explains it, while the home page shows our other work.