Palos Verdes Estates houses heading into a remodel, an addition or a teardown can start with a lab sample. Certified consultants take it, and our crew removes whatever tests positive.
Renters are about 1 in every 10 households in Palos Verdes Estates, and one-unit homes are more than 9 in every 10 homes.
Wall and floor material removed before a kitchen and family room become one room
Example project
Home
1960s ranch house in Palos Verdes Estates with a wall between the kitchen and the family room
Original request
Take out the wall between the rooms and set a beam in its place
Testing
A Cal/OSHA-certified asbestos consultant samples the wall texture and joint compound on both faces and the kitchen sheet vinyl and glue
Found
Asbestos in the joint compound and in the kitchen vinyl and glue
Clear
The wall texture
Area
About 160 sq ft of wall and floor
Timeline
Notice no later than 10 working days ahead, then three working days
Cost
$4,900
In this example, the owners of a 1960s ranch house are joining the kitchen and the family room. The wall is load-supporting and gets a beam, and taking out a load-supporting member counts as demolition, so the district notice is always required.
A remodel or addition in Palos Verdes Estates starts with a sample sent to a lab. The consultant collecting it holds Cal/OSHA certification, and positive material comes out. The steps are under asbestos testing and surveys.
Ceiling texture
Before a ceiling fan, new lights or a repaint, get the texture sampled. If it tests positive the room is sealed and the texture comes off, which popcorn ceiling removal describes in full.
Kitchen and garage floors
Old tile or sheet vinyl in a kitchen, bath, garage or utility room is sampled layer by layer before anyone lifts it. New flooring waits for the lab result, and the floor tile and mastic removal page has the details.
Plaster and drywall
A plaster, drywall or joint compound wall that you intend to open is sampled first, and any material inside its cavities is sampled when it needs to be identified. The removal itself is covered under drywall, joint compound and plaster removal.
Furnaces and attic ducts
Before a furnace or air handler is swapped, a sample of the old duct wrap and pipe insulation goes to the lab, since Rule 1403 treats the swap as renovation. What tested positive is removed and nothing else. HVAC duct and pipe insulation removal has the rest.
Additions and teardowns
Both an addition that takes out a load-supporting wall and a full teardown count as demolition. Renovation and demolition abatement explains how that works.
Palos Verdes Estates housing
More than 8 in every 10 homes in Palos Verdes Estates date from before 1980. Half of Palos Verdes Estates’ homes were built in or before 1964, and more than 1 in every 10 date from before 1950. A newer house is under the same survey rule as an older one, because Rule 1403 sets no cutoff by year of construction.
Palos Verdes Estates is on the South Coast Air Quality Management District’s list of cities in its jurisdiction, and houses count as covered structures under Rule 1403.
A survey comes prior to any demolition or renovation under the district’s rule, and the notice is due no later than 10 working days before the work. Your abatement contractor files it online.
Confirm what your address needs with the district at (909) 396-2336 or with the city’s building department before you set dates.
Rule 1403 leaves out an owner-occupant of a residential single-unit dwelling who does the renovation without anyone else’s hands on the work. That owner lives there, and the house is not vacant, a rental or a business. Anyone else doing the job, whether hired, a relative or a friend, brings it back under the rule. Waste deposited outside of the house stays under the rule too, and South Coast AQMD advises against home removal, citing potential exposure and cross contamination. The exception is for renovation only, never demolition. Please do not take samples yourself.
Does a teardown need a district notice?
The district must be notified of the intent to conduct any demolition, whether or not asbestos is found. Taking out a load-supporting structural member counts as demolition, and a demolition permit application includes a copy of the notification under state law, as the district describes it.
Who does the sampling?
Booking a Cal/OSHA-certified consultant or technician is our part, and the lab report comes back to you afterward. The sampling itself is theirs.
Where does the waste go?
California treats friable asbestos waste as hazardous waste and requires a licensed hauler and a manifest. The state’s asbestos limit counts only when the substances are in a friable, powdered or finely divided state, and other agencies may still limit nonfriable material.
We recommend calling, but do feel free to contact us using this form. We'll get back to you with a free, personalized quote or additional questions as soon as possible. We're here to help.