Joint compound and tape
Compound along drywall seams is tested as a separate material, so the lab report gives the board and the compound their own results.
Typical cost in Redondo Beach
Walls and ceilings built from drywall, joint compound or plaster may hold asbestos in any of those layers. A lab sample from the part you plan to open settles the question before the demolition crew arrives.
We remove the material that tested positive, bag it and clean up. New drywall and paint are not part of the removal.

Compound along drywall seams is tested as a separate material, so the lab report gives the board and the compound their own results.
Plaster is sampled where the work will open it. If the sample tested positive, we seal the room before the wall or ceiling comes down.
A new doorway, a wider opening or a removed partition starts with samples from the part of the wall that will come out. Taking out a load-supporting wall is demolition under Rule 1403.
Cavities hold material too. Where it has to be identified and sampled, the survey goes inside the wall or ceiling, so say which ones you plan to open.
We file the district notice online. If the job needs one, it goes in no later than 10 working days before any demolition or renovation activities, and the required fee comes with it. Taking out a load-supporting wall is demolition, and any demolition needs the notice.
Plaster and joint compound are sampled separately from the board they sit on, so the lab report can show a positive result for one layer and a negative one for another.

For a larger project, renovation and demolition abatement covers the survey and the notice in more detail, and the home page lists everything else we do.
We recommend calling, but do feel free to contact us using this form. We'll get back to you with a free, personalized quote or additional questions as soon as possible. We're here to help.